C1Premium-Inhalte · 5 Min

Finding Out Why a Historic Tunnel Tour Is Closed

Discuss a historic tunnel’s temporary closure, safety checks, and possible reopening plans.

Thema der Aktivität: Tour closure and safety inspections

C1Premium-Inhalte · 5 Min

Finding Out Why a Historic Tunnel Tour Is Closed

Discuss a historic tunnel’s temporary closure, safety checks, and possible reopening plans.

Thema der Aktivität: Tour closure and safety inspections

Vokabeln dieser Aktivität

  • That explains the barrier
  • From here
  • which is why
  • precautionary rather than a response to an accident
  • That seems sensible
  • I was hoping to see

Auszug

Rebecca

Gary, is this the entrance to the old harbor tunnel, or are we waiting in the wrong place?

Gary

Rebecca, it’s the entrance, but the guided tour is temporarily suspended while they inspect the emergency lighting.

Rebecca

That explains the barrier. From here, the tunnel looks impressive—narrow, vaulted, and still lined with the original brickwork.

Gary

It is, although the lower section floods after heavy rain, which is why they’re checking the drainage and evacuation route today.

Die vollständige Übung geht nach diesem Auszug weiter.

Was du übst

  • Audio Satz für Satz
  • 8 Sätze zum Laut-Sprechen, mit Bewertung

Diese vollständige Aktivität gehört zu Premium. Melde dich an, um deinen Zugang zu prüfen, oder übe kostenlos mit den Vorschlägen unten weiter.

Dein Lernpfad

Diese Angaben zeigen das Thema und die Fähigkeit, die in dieser Aktivität geübt werden.